    February 2000 December 2008 % Increase
  Thermal Generation Capacity 1240 MW 1786 MW 44.03
  Hydel Generation Capacity 120 MW 137.85 MW 14.88
  Total Generation Capacity (Thermal + Hydel) 1360 MW 1923.85 MW 41.46
  Increase in Generation Capacity     563.85    
  No. of EHT Sub Stations 27   62   129.63
  Length of EHT Line 5205 Circuit KM 7276 Circuit KM 39.79
  No. of 33/ 11 KV Substations 248   613   147.18
  Length of 33 KV Line 6988 Circuit KM 13095 Circuit KM 87.39
  No. of 11/ 0.4 KV Sub Station 29622   55184   86.29
  Length of 11 KV Line 40556 KM 56365.38 KM 38.98
  Length of LT Line 51314 KM 94626.5 KM 84.41
  Capacitor Installed 94 MVAR 934 MVAR 893.62
  No. of Electrified Villages 17953   19028   5.99
  Electification percentage 91   96.37   5.90
  No. of Electrified Majra Tola 10375   21542   107.63
  No. of Electrified pumps 72400   217295   200.13
  Single Point Connections 630389   1015105   61.03

 