Tender Notices |
|
Issuing Office |
Tender No. |
Scope of Work |
Estimated Cost |
Earnest Money Deposit (in Rs) |
Closing Date & Time for Sale of Tender |
Date & Time of Opening of Tender |
To View Original NIT Click Here |
|
CE(HR) CSPHCL |
03-1/Tender/ 2010/PM/801
|
Contract for Para Medical Services (Male/Female) |
|
Rs.500/- |
22-09-2010 up to 3:00 PM |
22-09-2010 at 4:00 PM |
NIT |
|
CE (S&P:Gen) |
03-03/ P-I/TN-168 |
Annual rate contract for supply of lubricants and grease to Power
Stations of CSPGCL
Manufacturing & Supply of EHV Gr-I Transformer Oil as per IS:335/ 1993
with latest amendment to power Stations of CSPGCL |
|
|
27-09-2010
28-09-2010 |
28-09-2010
29-09-2010 |
NIT
NIT |
|
SE(P&W) KE |
20-03/T-142
/10/MM-II/ |
Supply of
Attempration injection header for 4x50MW, PH-2, CSPGCL, Korba East. a.
LHS Attempration injection header b. RHS Attempration injection header |
|
Rs. 51050/- |
13-09-2010 |
14-09-2010 |
NIT |
|
CE (S&P:Gen) |
03-03/P-II/T-409 |
Manufacture and
supply of Crusher Hammers for Coal Handling Plants of Korba East, Korba
West & 2x250 MW TPS, Korba East |
|
|
|
24.09.2010
up-to 15.00 Hrs. |
NIT |
|
SE(P&W) KW |
OPRN-II/T-700/
2010
|
Sale
of Mill reject (Ungraded) from Coal reject Yard of HTPS, Korba West.
The estimated value is Rs. 2,10,00,000/- |
|
Rs. 2,10,000/- |
|
04-09-2010 |
Extension of Due Date
NIT |
|
SE(P&W) KE |
T-119/2010 |
Supply of Stator Coils including rewinding of 6.6 KV, 2000 KW BFP Motor
of PH.II, KTPS, Korba East. |
|
Rs. 10,500/- |
19-08-2010 |
20-08-2010 |
NIT |
|
SE(P&W) KE |
T-114/2010 |
Supply, installation & commissioning of 20/5T capacity cabin operated,
EOT crane for PH.n, KTPS Korba East. |
|
Rs. 1,42,100/- |
16-08-2010 |
17-08-2010 |
NIT |
|
CE (S&P:Gen) |
TN -160/ T-395 |
Award of work contract for sampling, analysis and monitoring of Air,
Water and Noise at HTTS Korba West for a period of One Year |
|
|
29.07.2010 |
30.07.2010 at 3:30 PM |
NIT
Instructions to Bidders |
|
CE (Civil-Maint-Gen.) |
CEC/M-G/
KW/W/ 2010/95 |
Annual R & M of ash dyke at Lotlota for unit III & IV at HTPS Korba West |
14.73 lacs |
Rs.14,800/- |
22.07.2010 |
23.07.2010 at 16.15 Hrs. |
NIT |
|
CE (Civil-Maint-Gen.) |
CEC/M-G/
KW/W/ 2010/94 |
Annual R & M of Danganiyakhar ash dyke unit I & II at HTPS Korba West |
19.24 lacs |
Rs.19,300/- |
22.07.2010 |
23.07.2010 at 16.15 Hrs. |
NIT |
|
CE (S&P:Gen) |
03-03/SE-IV/T-395/2010 |
Award of work contract for sampling, analysis and monitoring of Air,
Water and Noise at HTPS: Korba West for a period of 1 year. |
|
14000/- |
|
30/07/2010
At 16.00
Hrs |
NIT |
|
SE(P&W) KE |
20-03/KEB/ P&W/CT/T-112/10 |
Transportation of Coal from HTPS, Korba West. Coal Yard to KTPS, Korba
East. Qty. : 2,00,000 MT |
|
82,000/- |
06-07-2010 |
07-07-2010 |
NIT |
|
SE(P&W) KE |
T-96, T-97 & T-98 |
Rewinding of stator coils |
|
|
26-07-2010 05-07-2010 |
27-07-2010 06-07-2010 |
Extension of Due Date NIT |
|
CE (S&P:Gen) |
03-03/P-I/
T-402, 403,404,405 |
Supply of Ferric Alum, Supply of Anhydrous
Ammonia, Supply of Hydrazine Hydrate, Supply of Strong Base Anion Resin,
Weak Base Resin, Cation Resin Mixed Bed Grade & Anion Resin Mixed Bed
Grade |
|
|
|
29-07-2010
20-07-2010 up to 15.00 Hrs. |
NIT
Corrigendum-II-T-403
Corrigendum-T403
Corrigendum-T405 |
|
CE (S&P:Gen) |
03-03/P-II/T-399 |
(A) Centrifugally
cast carbide inserted Grinding Rolls (in improved metallurgy) for BHEL
make XRP-803 coal mills of 210 MW HTPS, Korba West. (1 set=3 Nos. of
grinding rolls).
(B) Hi-Chrome
Bullring Segments for BHEL make XRP-803 coal mills of 210 MW HTPS, Korba
West. (1 set = 45 Nos. of bullring segments). |
|
|
|
26.07.2010
15-07-2010
29.06.2010
up to 15.00 Hrs.
|
Corrigendum-II
Date Exte.
NIT |
|
SE(P&W) KE |
20-03/KEB/
P&W/ T- 101/2010 |
Work
contract for O&M of D.F.G.C. System of 4X50 MW units, PH-II, CSPGCL,
Korba East |
|
Rs. 60,200/-
|
|
25-06-2010 |
NIT |
|
CE (S&P:Gen) |
03-03/SE-III/T-401/2010 |
Supply of 220 KV CVTs required for HTPS: Korba West & KTPS: Korba East. |
|
Rs. 40,000/- |
29/06/2010
upto 15:00 Hrs. |
27/07/2010
at 16.00 Hrs. |
NIT Corrigendum
Corrigendum
II
|
|
CE (S&P:Gen) |
03-03/P-I/ T-398/2010 |
Supply of Stable Bleaching Powder conforming to IS-1065/1989 Revision-II |
|
|
|
07-07-2010
16.06.2010
Up to
15.00 Hrs. |
Corrigendum
II
Corrigendum I
NIT |
|
CE (S&P:Gen) |
03-03/P-I/ T-397/2010 |
Supply of SS Steel Plates and Structural Steel viz. SS Flats, Tor Steel,
R.S. Joists, Rail Pole etc. conforming to IS-2062/ Other Relevant IS |
|
|
|
06-08-2010
03-07-2010
15.06.2010
Up to
15.00 Hrs. |
Corrigendum-III
Corrigendum
II
Corrigendum
NIT |
|
SE(P&W) KE |
20-03/KEB/ P&W/ET& I-III/EMD T-78 /10 |
Supply of Colleting electrodes size 500X1.5 MM for 4X50 MW, PH-II, ESP,
KTPS, Korba East. |
|
52,400/- |
02/06/2010 |
03/06/2010 |
NIT |
|
SE(P&W) KE |
20-03/KEB/ P&W/ET& I-III/EMD T-77 /10 |
Supply of Emiting Electrodes for ESP unit no.1,3 and 4 of PH-II, KTPS,
Korba East. |
|
25,500/- |
03/06/2010 |
04/06/2010 |
NIT |
|
CE (S&P:Gen) |
03-01/CE
(O&M:Gen)/TS/10/2010 Kawardha |
Supply of
Rice Husk to 6 MW Cogen Plant, situated in the premises of M/s
Bhoramdeo Sahakari Shakkar Udpadak Karkhana (BSSUKM), Ramhepur, Kawardha
Distt. Kabirdam, (CG) |
|
65000/-
|
29/05/2010
upto 15.00 hrs |
31/05/2010
at 16.00 hrs |
NIT |
|
CE (S&P:Gen) |
03-01/CE
(O&M:Gen)/TS-11/2010 Kawardha |
Transportation of coal from HTPS Korba West to 6
MW Cogen Plant Kawardha.
|
Rs. 50
lakhs |
1,00,000/-
|
18/06/2010 upto 16.00 hrs |
21/06/2010
at 16.00 hrs |
NIT |
|
CE (S&P:Gen) |
03-03/P-II/T-396 |
Manufacture & supply of Plain end centrifugally cast iron spun pressure
pipe of 200 Nb & 250 Nb (as per IS: 1536/2001) and Black Steel Tubes of
sizes 200 Nb, 250 Nb & 300 Nb with beveling angle of 35 degree (as per
IS: 3589-2001 Gr.410). |
|
|
|
10.09.2010 up to 15.00 Hrs. |
Corrigendum-V
Corrigendum-IV
Corrigendum
III
Corrigendum-II
Corrigendum
NIT |
ED (PRG-I)
CSPGCL, Raipur |
03-05/T-04/2010 |
Deployment of Security Personnel for security of Marwa -
TendubhataThermal Power Project of C.S.P.G.C.L. being installed at
Champa-Janjgir distict. |
|
Rs. 37,000/- |
03.05.2010 up to 15.00 Hrs. |
03.05.2010 up to 15.00 Hrs. |
NIT |
|
SE(P&W) KE |
20-03 /KEB /P&W/MM-II/T-66/2010 |
Supply of High Pressure tube spares |
|
Rs. 16,500/- |
29.04.2010 |
30.04.2010 |
NIT |
|
SE(P&W) KE |
20-03 /KEB / P&W/ MM-II/T-65 /2010 |
Supply of various type Ball mill liners. |
|
Rs. 63,400/- |
29.04.2010 |
30.04.2010 |
NIT |
|
SE(P&W) KE |
20-03 /KEB /P&W/MM-II/T-64/2010 |
Complete assembly .of Reduction Gear Box of Ball mill |
|
Rs. 39,600/ |
29.04.2010 |
30.04.2010 |
NIT |
|
SE(P&W) DSPM TPS, KE |
25-03/DSPM TPS/P&W/
BMD/T -396/10 |
0&M of complete ash handling system of DSPM TPS, 2x250 MW, CSPGCL, Korba
East |
|
Rs. 1,48,800/- |
|
30.04.2010 |
NIT |
|
ED(Civil), CSPGCL,
Raipur |
EDC-Proj/ 2x500
MW-Marwa/ W/2009/225 |
Construction of
44 Nos. “E” type and 36 Nos. “F” type staff quarters i/c internal water
supply & electrification at 2x500 MW Marwa TTPP |
Rs. 4.90 Crores |
Rs. 4,90,000/- |
20.04.2010 |
21.04.2010 at 4.15
P.M |
NIT |
|
ED(Civil), CSPGCL,
Raipur |
EDC-Proj/ 2x500
MW-Marwa/ W/2009/224 |
Construction of 33
Nos. “A, B & C” type staff quarters i/c internal water supply &
electrification at 2x500 MW Marwa TTPP |
Rs.3.1 Crores. |
Rs. 3,10,000/- |
20.04.2010 |
21.04.2010 at 4.15
P.M |
NIT |
|
SE(P&W)HTPS : CSPGCL : KORBA WEST |
CHEM/T-678/ 2010 |
Supply of 100 Nos.
Plate Screen PT 400 1428.10 for Coal crusher C/816/31AB. 15,22,500/- |
Rs. 15,22,500/- |
15,250/- |
|
30-04-2010 |
Corrigendum NIT |
|
SE(P&W)HTPS : CSPGCL : KORBA WEST |
B-I/ T-677/
2010 |
Dismantling,
erection & commissioning of 145 Nos. Economizer Lower Bank Coils in 210
MW BHEL boiler Unit No.2, Korba West |
Rs. 20,00,000/- |
20,000/- |
|
29-04-2010 |
NIT |
|
SE(P&W)HTPS : CSPGCL : KORBA WEST |
T&C-II /
T-676/2010 |
Supply of 01 No.
On Line Leakage Current Monitor kit in SCOPE / TransiNOV AS for
lightening Arrestors for HTPS, KW. |
Rs.
15,22,500/- |
15225/- |
|
28-04-2010 |
NIT |
|
SE(P&W)HTPS : CSPGCL : KORBA WEST |
HBHPS / T-675/2010 |
Supply & retubing of Tube Cupro-nickel
for HBHPS, Machadoli
(a) for Generator air coolers & retubing
of Generator air coolers -584 Nos.
(b) for pit oil
coolers & retubing of pit oil coolers- 560 Nos. |
Rs. 33,19,360/- |
33200/- |
|
27-04-2010 |
NIT |
|
CE(Civil Maint-Gen.) |
CE(CMG)/KWB /W/2009/13 |
IXth stage raising of DanganiaKhar Ash Bund Pond ‘B’ from RL 307.00 to
310.00 M for Unit No. I & II at HTPS, CSPGCL, Korba West. |
Rs. 104.8 Lacs |
1,04,800/- |
01.04.2010 |
03.04.2010 at 4.15 P.M. |
NIT |
|
SE(P&W)HTPS : CSPGCL : KORBA WEST |
021-10/B-II/ T-665/2010 |
Supply of Collecting electrodes for lurgi design ESP (Size
46/12/6x8/0.3/5-156-4) of 210 MW ABL Boilers of HTPS, KW. |
54,26,604/- |
54,270/- |
|
23.03.2010 |
NIT |
|
CE (S&P:Gen) |
03-03/P-I/T-388/2010 |
Supply of Sulphuric Acid having 98%
Concentration & conforming to ISS-266/1977 for KTPS Korba East, DSPM TPS
Korba East and HTPS Korba West Thermal Power Plant. |
|
|
|
20.04.2010 Up to 15.00 Hrs. |
NIT
Corrigendum-II |
|
CE (S&P:Gen) |
03-03/P-I/ T- 389
/2010 |
Supply of Hydrated Lime |
|
|
|
26.03.2010 |
NIT |
|
ED(PRG-I)
|
03-05/CP/ MTPP/T16-09
|
For annual operation & maintenance of 2x5 MVA, 33/11 kV
substation, 10 nos. 11/0.433 kV, 500 kVA transformer, 10 nos.
415 V distribution boards and 8.5 km long 11 kV line, double pole
structures on 280 kg. 9.1 meter long PCC pole in 2x500 MW Marwa –
Tendubhata TPP Dist. Janjgir – Champa (Chhattisgarh) for construction
power supply to BTG & BOP contractors. |
|
12,500/- |
Sale :
Up to 22.02.2010 , 17:00 Hrs. Submission : Up to
23.02.2010, 15:00 Hrs.
|
On 23.02.2010 at 16:00 Hrs. |
NIT |
|
SE(P&W)HTPS : CSPGCL : KORBA WEST |
021-10/B-I/ T-664/2010 |
Operation & Maintenance of DFGC System of PH-I & II of HTPS, Korba West. |
|
57,500/- |
|
16.03.2010 |
NIT |
|
CE (S&P:Gen) |
03-03/SE-III/TN-142/T-373/2009 |
Supply, erection, testing and commissioning of online Availability Based
Tariff (ABT) monitoring system at HTPS: Korba West, KTPS: Korba East,
DSPM TPS: Korba East and Generating Control Center at Raipur |
|
|
|
01.05.2010 up to 16:00 Hrs |
Corrigendum-V
Corrigendum-IV
Corrigendum-III
Corrigendum |
|
CE (S&P:Gen) |
03-03/P-III/T-383/10 |
Deployment of
Security Personnel for security of Power Stations and other
Installations of C.S.P.G.C.L. at KTPS, Korba East; HTPS, Korba West,
DSPM TPS, Korba East; Minimata Hasdeo Bango Hydel Power Plant, Machadoli;
Gangrel Hydel Power Plant, Gangrel and Sikasar HEP, Sikasar |
|
4,80,000/- |
|
03.03.2010 |
NIT |
|
CE (S&P:Gen) |
03-03/P-I/ T-385/2010 |
Manufacturing &
supply of Structural Steel viz. MS Angle, MS Rods, Flats, Channels,
Tor Steel, R.S. Joists, EN Bars etc. |
|
|
|
24.02.2010 |
NIT |
|
CE (S&P:Gen) |
03-03/P-I/ T-384/2010 |
Manufacturing &
supply of Steel Plates viz. MS Plate, MS Chequered Plate, GP Sheet, GI
Sheet, HR Sheet etc. |
|
|
|
25.03.2010 |
Corrigendum-II
Corrigendum-I
NIT
|
|
CE (S&P:Gen) |
03-03/P-II/ T-378
|
Manufacture and
supply of High Pressure Economizer Elements for 210 MW ABL Boilers of
HTPS, Korba West. |
|
|
|
19.02.2010 |
NIT |
|
CE (O&M:Gen) |
03-01/CE (O&M:Gen)/TS-05/ Kawardha |
Supply &
Installation of 1 No. 15 MT capacity DM Plant at 6 MW Cogen Plant,
Ramhepur, Kawardha, (Bhoramdeo Sahakari Shakkar Karkhana, Premises),
Distt. Kabirdam, (C.G.) |
|
35,000/-
|
11.02.2010 |
15.02.2010 |
NIT |
|
SE(P&W) KTPS, KE |
20-03/KEB/ P&W/T-22/ 2010 |
Transportation of
coal from Manikpur Colliery to KTPS, Korba East.
|
|
1,24,000/- |
19.01.2010 |
20.01.2010 |
NIT |
|
CE (S&P:Gen) |
03-03/P-II/T-382 |
Manufacture and supply of Conveyor Rollers for Coal Handling Plants of
Korba East, Korba West & 2x250 MW DSPM TPS, Korba East. |
85.00 Lakhs |
|
|
04.02.2010 |
NIT |
|
CE (O&M:Gen) |
03-01/CE
(O&M:Gen)/TS-04/ Kawardha |
Supply of Rice Husk to 6 MW Cogen Plant,
situated in the premises of M/s Bhoramdeo Sahakari Shakkar Udpadak
Karkhana (BSSUKM), Ramhepur, Kawardha Distt. Kabirdam, (CG).
Qty. : 12000 MT
Period
– 120 days |
|
3,00,000/-
|
|
27.01.2010 |
Extended Due Date |
|
SE(P&W) KTPS, KE |
T-20/2010 |
Instrument ckt. Unit 5 & 6 |
6.10
(Rs. in lacs) |
6500/- |
09.02.2010 |
10.02.2010 |
NIT |
|
SE(P&W) KTPS, KE |
T-19/2010 |
Electrical ckt. Unit 5 & 6 |
34.25
(Rs. in lacs) |
35,000/- |
29.01.2010 |
30.01.2010 |
NIT |
|
|
SE(P&W) KTPS, KE |
T-18/2010 |
Instrument ckt. Unit 1 to 4 |
7.40
(Rs. in lacs) |
7500/- |
09.02.2010 |
10.02.2010 |
NIT |
|
|
SE(P&W) KTPS, KE |
T-17/2010 |
Electrical ckt. Unit 1 to 4 |
50.10
(Rs. in lacs) |
51,000/- |
29.01.2010 |
30.01.2010 |
NIT |
|
|
SE(P&W) KTPS, KE |
T-16/2010 |
Turbine ckt. Package B U-5 & 6. |
22.80
(Rs. in lacs) |
23,000/- |
08.02.2010 |
09.02.2010 |
NIT |
|
|
SE(P&W) KTPS, KE |
T-15/2010 |
Turbine ckt. Package A U-5 & 6. |
45.60
(Rs. in lacs) |
46,000/- |
08.02.2010 |
09.02.2010 |
NIT |
|
|
SE(P&W) KTPS, KE |
T-14/2010 |
Raw Coal Bunker Cleaning of PHIII units |
2.50
(Rs. in lacs) |
2500/- |
09.02.2010 |
10.02.2010 |
NIT |
|
|
SE(P&W) KTPS, KE |
T-13/2010 |
Duct & dampers U-5 & 6. |
12.00
(Rs. in lacs) |
12,000/- |
29.01.2010 |
30.01.2010 |
NIT |
|
|
SE(P&W) KTPS, KE |
T-12/2010 |
Fan ckt. U-5 & 6 |
18.00
(Rs. in lacs) |
18,000/- |
01.02.2010 |
02.02.2010 |
NIT |
|
|
SE(P&W) KTPS, KE |
T-11/2010 |
Air heater + ESP mechanical part
U-5 & 6 |
14.95
(Rs. in lacs) |
15,000/- |
05.02.2010 |
06.02.2010 |
NIT |
|
|
SE(P&W) KTPS, KE |
T-10/2010 |
Coal mill ckt. U-6 |
23.35
(Rs. in lacs) |
24,000/- |
01.02.2010 |
02.02.2010 |
NIT |
|
|
SE(P&W) KTPS, KE |
T-09/2010 |
HP Part ckt.U-6 |
78.00
(Rs. in lacs) |
80,000/- |
03.02.2010 |
04.02.2010 |
NIT |
|
|
SE(P&W) KTPS, KE |
T-08/2010 |
Coal mill ckt. U-5 |
24.60
(Rs. in lacs) |
25,000/- |
01.02.2010 |
02.02.2010 |
NIT |
|
|
SE(P&W) KTPS, KE |
T-07/2010 |
HP Part Ckt. U-5 |
70.00
(Rs. in lacs) |
70,000/- |
03.02.2010 |
04.02.2010 |
NIT |
|
|
SE(P&W) KTPS, KE |
T-06/2010 |
Turbine ckt pack-A U-1to4 |
69.15
(Rs. in lacs) |
70,000/- |
08.02.2010 |
09.02.2010 |
NIT |
|
|
SE(P&W) KTPS, KE |
T-05/2010 |
Dust preparation & burner ckt. U-1to4 |
21.90
(Rs. in lacs) |
22,000/- |
05.02.2010 |
06.02.2010 |
NIT |
|
|
SE(P&W) KTPS, KE |
T-04/2010 |
Air Heater & ESP Mech. ckt U-1 to 4 |
38.50
(Rs. in lacs) |
39,000/- |
05.02.2010 |
06.02.2010 |
NIT |
|
|
SE(P&W) KTPS, KE |
T-03/2010 |
Mill & Fan ckt U-1 to 4 |
56.00
(Rs. in lacs) |
56,000/- |
01.02.2010 |
02.02.2010 |
NIT |
|
|
SE(P&W) KTPS, KE |
T-02/2010 |
HP
Part & Refractory ckt. U-1 to 4 |
115.00
(Rs. in lacs) |
1,15,000/- |
03.02.2010 |
04.02.2010 |
NIT |
|
|
CE (S&P:Gen) |
03-03/P-II/T-381 |
Manufacture & supply
of:- (A) Centrifugally cast carbide inserted Grinding
Rolls (in improved metallurgy) for BHEL make XRP-883 coal mills of 2x250
MW TPS, Korba East. (1 set=3 Nos. of grinding rolls).
(B) Hi-Chrome Bullring
Segments for BHEL make XRP-883 coal mills of 2x250 MW TPS, Korba East.
(1 set = 45 Nos. of bullring segments). |
208.85 (Rs. in lacs)
44.90 (Rs. in lacs) |
|
|
30.01.2010 |
NIT |
|
|
SE(P&W)HTPS : CSPGCL : KORBA WEST |
021-10/BLR/ AOH-10/T-648/2010 |
Annual Overhaul of Tubular Air heater of 2 x 210 MW ABLBoilers. |
48,99,790/- |
49,000/- |
16.02.2010 |
17.02.2010 |
NIT |
|
|
SE(P&W)HTPS : CSPGCL : KORBA WEST |
021-10/BLR/ AOH-10/T-647/2010 |
Annual Overhaul of Air and Flue Gas duct, Insulation, LT water line
valves, Air and flue gas dumpers eroded pipe line, expansion joints
etc. of 2 x 210 MW, ABL, Boilers. |
45,06,780/- |
45,070/- |
10.02.2010 |
11.02.2010 |
NIT |
|
|
SE(P&W)HTPS : CSPGCL : KORBA WEST |
021-10/BLR/AOH-10/T-646/2010 |
Annual Overhaul of ID, FD & PA Fans of 2x210 MW
ABL, Boilers including round the year work of auxiliaries. |
63,40,374/- |
63,410/- |
08.02.2010 |
09.02.2010 |
NIT |
|
|
SE(P&W)HTPS : CSPGCL : KORBA WEST |
021-10/BLR/AOH-10/T-645/2010 |
Annual Overhaul of ESP of 2 x 210 MW ABL Boilers, including supply of
consumbles |
61,23,509/- |
61,240/- |
04.02.2010 |
05.02.2010 |
NIT |
|
|
SE(P&W)HTPS : CSPGCL : KORBA WEST |
021-10/BLR/AOH-10/T-644/2010 |
Overhauling of Mills & its components, Raw coal feeder pipes & bends
etc. of ABL Boiler |
66,59,460/- |
66,600/- |
02.02.2010 |
03.02.2010 |
NIT |
|
|
SE(P&W)HTPS : CSPGCL : KORBA WEST |
021-10/BLR/AOH-10/T-643/2010 |
Annual Overhaul of pressure parts, slag conveyors, HP Valves, Hangers,
Wind Box, Burners etc. of 210 MW ABL Boilers of Unit No. 3 & 4 at HTPS,
Korba West Bank |
2,60,28,811/- |
2,60,290/- |
29.01.2010 |
30.01.2010 |
NIT |
|
|
SE(P&W)HTPS : CSPGCL : KORBA WEST |
021-10/BLR/ AOH-10/T-642/2010 |
Annual Overhaul of Rotary Air heater of 2 x 210 MW BHEL Boilers |
10,87,255/- |
10,875/- |
15.02.2010 |
16.02.2010 |
NIT |
|
|
SE(P&W)HTPS : CSPGCL : KORBA WEST |
021-10/BLR/ AOH-10/T-641/2010 |
Annual Overhaul of Air and Flue Gas duct, Insulation, LT water line
valves, Air and flue gas dumpers eroded pipe line, expansion joints
etc. of 2 x 210 MW, BHEL, Boilers |
34,17,440/- |
34,175/- |
09.02.2010 |
10.02.2010 |
NIT |
|
|
SE(P&W)HTPS : CSPGCL : KORBA WEST |
021-10/BLR/ AOH-10/T-640/2010 |
Annual Overhaul of ID, FD & PA Fans of 2x210 MW BHEL, Boilers
including round the year work of auxiliaries. |
34,04,888/- |
34,050/- |
05.02.2010 |
06.02.2010 |
NIT |
|
|
SE(P&W)HTPS : CSPGCL : KORBA WEST |
021-10/BLR/ AOH-10/T-639/2010 |
Annual Overhaul of ESP of 2 x 210 MW BHEL Boilers, including supply of
consumbles |
32,36,464/- |
32,370/- |
03.02.2010 |
04.02.2010 |
NIT |
|
|
SE(P&W)HTPS : CSPGCL : KORBA WEST |
021-10/BLR/ AOH-10/T-638/2010 |
Overhauling of Mills & its components, Raw coal feeder pipes & bends
etc. of BHEL Boiler |
87,21,900/- |
87,220/- |
01.02.2010 |
02.02.2010 |
NIT |
|
|
SE(P&W)HTPS : CSPGCL : KORBA WEST |
021-10/BLR/ AOH-10/T-637/2010 |
Annual Overhaul of pressure parts, slag conveyors, HP Valves, Hangers,
Wind Box, Burners etc. of 210 MW BHEL Boilers of Unit No. 1 to 2 at HTPS,
Korba West Bank. |
1,69,34,238/- |
1,69,350/- |
28.01.2010 |
29.01.2010 |
NIT |
|
|
CE (S&P:Gen) |
03-03/P-I/ T-372/2009 |
Manufacturing & supply of 1.1 KV Copper Control cables |
|
|
|
03.02.2010 |
NIT |
|
|
CE (S&P:Gen) |
03-03/P-I/ T-371/2009 |
Manufacturing & supply of 1.1 KV Aluminum Power Cables and 6.6 KV
Aluminum XLPE Cables. |
|
|
|
02.02.2010 |
NIT |
|
|
CE (S&P:Gen) |
03-03/P-II/ T-376 |
3rd Party Inspection of materials, required for Power Stations, being
ordered from this office as per ordered technical specification and
terms & conditions. |
|
|
|
22.01.2010 |
NIT |
|
|
CE (S&P:Gen) |
03-03/P-I/ T-375/2009 |
Supply of Caustic Soda Lye. |
|
|
|
30.01.2010 |
NIT |
|
|
SE(P&W) DSPM TPS, KE |
T-345/09 |
AOH & RYM of ESP package |
17.09 lakh |
17,000/- |
15.01.2010 |
18.01.2010 |
NIT |
|
|
SE(P&W) DSPM TPS, KE |
T-344/09 |
AOH & RYM of Rotary Air Heater |
31.62 lakh |
31,600/- |
11.03.2010 |
12.03.2010 |
Extention Date
NIT |
|
|
SE(P&W) DSPM TPS, KE |
T-342/09 |
AOH & RYM of milling system |
68.74 lakh |
68,700/- |
13.01.2010 |
14.01.2010 |
NIT |
|
|
SE(P&W) DSPM TPS, KE |
T-341/09 |
AOH & RYM Boiler pr. parts |
82.11 lakh |
82,000/- |
12.01.2010 |
13.01.2010 |
NIT |
|
|
CE (O&M:Gen) |
03-01/CE
(O&M:Gen)/TS-04/ Kawardha |
Supply of Rice Husk to 6 MW Cogen Plant,
situated in the premises of M/s Bhoramdeo Sahakari Shakkar Udpadak
Karkhana (BSSUKM), Ramhepur, Kawardha Distt. Kabirdam, (CG).
Qty. : 12000 MT
Period
– 120 days |
|
3,00,000/-
|
02.01.2010 |
04.01.2010 |
NIT |
|
|
CE (S&P:Gen) |
03-03/SE-III/TN-139/ T-368/2009 |
Supply, Erection , Testing & Commissioning of 400/220 KV , Auto
transformer bays (One No. 400 KV Bay and One No. 220 KV Bay ,excluding
supply, erection, testing & commissioning of 3X166.7 MVA 400/220 KV Auto
Transformer), including Civil & Structural Works at HTPS Korba West on
turn key basis. |
|
Rs. 4 Lacs |
Upto 11/05/2010 |
11/05/2010 at 16:00 Hrs. |
Corridendum-III
Corrigendum-II
Corrigendum
|
|
|
CE (S&P:Gen) |
03-03/SE-III/T-373/ 2009 |
Supply, erection, testing and commissioning of online Availability Based
Tariff (ABT) monitoring system at HTPS: Korba West, KTPS: Korba East,
DSPM TPS: Korba East and Generating Control Center at Raipur |
|
Rs. 3 Lacs |
|
30.12.2009 16:00 Hrs. |
NIT |
|
|
|